Skoda Fabia

since 2000 release

Repair and operation of the car



Skoda Fabia
+ 1.1. Description of the car
+ 2. Engine
+ 3. Lubrication system
+ 4. Power supply system
+ 5. Cooling system
- 6. System of production of the fulfilled gases
   6.1. Check of tightness of system of production of the fulfilled gases
   6.2. Removal and installation of a reception pipe of the muffler (petrol engines)
   6.3. Removal and installation of a reception pipe of the muffler (diesel engines)
   6.4. Replacement of knots of the muffler in collecting (the resonator or the muffler)
   6.5. System of recirculation of the fulfilled gases (engines of 1,4 l, 55 and 74 kW)
   6.6. System of recirculation of the fulfilled gases (engines of 1,9 l, 74 kW)
   6.7. System of recirculation of the fulfilled gases (engines of 1,9 l, 47 kW)
+ 7. Transmission and running gear
+ 8. Steering
+ 9. Brake system
+ 10. Electric equipment
+ 11. Body
+ 12. Electrical circuitries




6.5. System of recirculation of the fulfilled gases (engines of 1,4 l, 55 and 74 kW)

GENERAL INFORMATION

Details of system of recirculation of the fulfilled gases of engines of 1,4 l, 55 and 74 kW

1 – connecting block;
2 – recirculation valve;
3 – a hose to the air filter;
4 – flange;
5 – bolts of fastening of a flange;
6 – final collector;
7 – screws of fastening of a connecting pipe to a final collector;
8 – bolt of fastening of a connecting pipe;
9 – connecting pipe;
10 – bolts of fastening of the valve and exhaust pipe;
11 – laying

Check of the electromagnetic valve

Check of the electromagnetic valve see in subsection 4.25.

Removal and installation of elements of system of recirculation

PERFORMANCE ORDER
1. Disconnect a wire from the - plug of the rechargeable battery.
2. Disconnect a block 1 with wires from the electromagnetic valve 2 systems of recirculation.
3. Disconnect a hose 3 air filters from the electromagnetic valve of system of recirculation.
4. Turn off two bolts of the 10th fastening and remove the electromagnetic valve.
5. For removal of a connecting pipe 9 unscrew two screws 7 and a bolt of the 8th its fastening.
6. Replace laying 11 irrespective of their state.
7. Establish elements of system of recirculation of the fulfilled gases upside-down.

The moment of an inhaling of bolts of fastening of a connecting pipe – 10 N · m.